For lift shaft cladding, CETRIS provides a non-combustible, impact-tough and dimensionally stable layer in class A2-s1,d0 per EN 13501-1. The assembly’s fire resistance depends on the whole build-up and is given per solution once the basis is confirmed.

Swedish AMA code KEK — Layer of cement-bonded particle board
FAQ
Clear answers to the questions buyers and specifiers most often ask before selecting and ordering.
For lift shafts, our range includes CETRIS BASIC. The boards differ in surface, edge profile, thickness and reaction-to-fire class; each product page lists formats and weights. Choose by the requirements of the assembly: exposure, structural function, supporting frame and joint layout decide which board fits best.
Thickness depends on load, span or support spacing, fixing pattern, board format and impact, fire or acoustic requirements. It cannot be selected safely from the application alone. Use the manufacturer’s design tables and have the responsible structural engineer verify all load-bearing or safety-critical parts of the assembly.
Not by itself. A2-s1,d0 or B-s1,d0 describes the board’s reaction to fire, not the fire resistance of the assembly. EI, REI and lining requirements apply to the complete build-up, including board layers, framing, insulation, joints and fixings. Use a documented CETRIS system and verify that its exact construction matches the project requirement.
Reliable drainage, ventilation, correct joint width, sealed cut edges and corrosion-resistant fixings are essential. Store boards dry and allow them to acclimatise before installation. Avoid details that trap water or restrain the board’s movement. Always follow the current installation guidance for both the product and the selected system solution.
Yes, many CETRIS systems can use timber or steel supporting frames, but screw type, pre-drilling, edge distance and fixing centres differ. The substrate must be designed, level and suitable for the exposure. Facade, fire-protective and load-bearing applications must follow the documented fixing layout rather than a general rule of thumb.
Keep the current technical data sheet, declaration of performance and relevant installation or system guide. Fire, structural, facade and balcony work often needs additional design documents and details. Product pages provide basic data, while the technical library collects design files. Resolve any uncertainties with the responsible designer before placing the order.